FAQ'S > General Pebble Flex Installation Questions > How long does it take to install Pebble Flex?

Search the FAQ's for entries containing:

That can very based on the square footage being installed.  Usually any installation under 1500 sf can be installed in two days.

Day 1. Is the prep of the existing surface

Day 2. Is the actual installation of Pebble Flex

We always recommend at least a 48 hour cure time which can change based on climate.

Last updated on May 22, 2010 by Pebble Flex of Florida